Capacity
5 kW
System type
Grid-tied
Duration
4 days
Structure
Galvanised, pitched roof
Location
Gurab Zarmikh, Gilan
Year
2024

The brief

The client had a high electricity bill and an unshaded south-facing roof. The requirement was to cut the bill rather than to leave the grid, so the system was designed grid-tied and battery-free to keep the cost where it does the most good.

How it was done

  1. 01 Twelve months of bills reviewed and capacity set from actual consumption
  2. 02 Shading from surrounding trees checked across the day
  3. 03 Galvanised mounting structure calculated for local snow and wind loading
  4. 04 DC runs in protected containment, with a fuse and isolator per string
  5. 05 Surge arrestors on both DC and AC sides, given how often the area takes lightning
  6. 06 String insulation tested and an I–V curve recorded at commissioning

The outcome

The array produced from the day it was energised, and the handover pack of single-line diagram, string schedule and commissioning report went to the client. An annual service was set up for panel washing and connection inspection.

Contact

Describe the job and I will take it from there

One short call is usually enough to establish what the work is, how long it takes and roughly what it costs.

Call for an accurate estimate. If I am on a job and miss the call, I ring back as soon as I am off the ladder.