Solar power 2024

Rooftop solar, Gurab Zarmikh

A grid-tied array on the pitched roof of a village house, on galvanised structure rated for snow load.

Capacity
5 kW
System type
Grid-tied
Gurab Zarmikh, Gilan
Smart home 2024

Smart villa, Soumeh Sara

Lighting, blind and cooling control on a local controller, with every wall switch kept working.

Controlled points
34
Protocol
Zigbee, local mesh
Soumeh Sara, Gilan
CCTV 2023

Shop CCTV and alarm, Soumeh Sara

Six IP cameras positioned at identification height, alongside an alarm with call-out notification.

Cameras
6, IP
Retention
30 days
Soumeh Sara, Gilan
Solar power 2023

Off-grid system for a livestock unit, Ziabar

Power for pumping, lighting and ventilation where extending the grid made no economic sense.

System type
Off-grid
Primary load
Water pump and ventilation
Ziabar, Soumeh Sara
Building electrical 2023

Full rewire of an older house, Kasma

Perished wiring replaced throughout, circuits redivided, and a new earth pit installed and measured.

Points
58
Circuits
11 separate circuits
Kasma, Soumeh Sara
HV and LV switchboards 2024

Workshop distribution and control board, Marjaghal

A distribution board built to a calculated fault level, with discrimination and power factor correction.

Standard
IEC 61439
Outgoing ways
14
Marjaghal, Soumeh Sara
Building electrical 2024

Full rewire of an old house, Sabzeh Meydan, Rasht

Cloth-insulated wiring and old fuses in a two-storey brick house replaced with new wiring, an earth and a modern board.

Points
78
Circuits
14
Sabzeh Meydan, Rasht
CCTV 2025

Apartment block CCTV, Golsar, Rasht

Twelve IP cameras covering the entrance, lobby, car park and roof of a ten-storey block, with mobile access for the building management.

Cameras
12, IP
Retention
30 days
Golsar, Rasht
Video and audio intercom 2024

Video intercom for an eight-unit block, Manzarieh, Rasht

An old audio intercom replaced with a two-wire video system, reusing part of the existing cable, with a weatherproof door panel.

Units
8
System
Two-wire video
Manzarieh, Rasht
HV and LV switchboards 2023

Shop board and earthing, Rasht Bazaar

A new board with separated circuits and RCD for a bazaar shop whose main fuse kept tripping and which had no earth.

Circuits
8
Supply
Single-phase, 32 A
Rasht Bazaar
Building electrical 2025

RCD tripping in rain traced and fixed, Hamidian, Rasht

A leak to earth found on the garden lighting circuit and in a waterlogged junction box, which cut power to the whole house every time it rained.

Circuits tested
11
Faults found
2
Hamidian, Rasht
Solar power 2025

Hybrid solar with battery for power cuts, Pirsara, Rasht

A hybrid system on the roof of a villa on the edge of Rasht that keeps the fridge, water pump, lighting and router running during cuts.

Array
4 kW
Inverter
5 kW hybrid
Pirsara, Rasht
Smart home 2024

Smart lighting and thermostat for a flat, Bolvar-e Moallem, Rasht

Lighting and boiler heating control in a finished flat, with no breaking out and every wall switch kept.

Controlled points
22
Protocol
Zigbee, local controller
Bolvar-e Moallem, Rasht
Alarm and security 2023

Office intruder alarm, Ostadsara, Rasht

A five-zone wired alarm for a ground-floor office, with phone notification and backup battery for power cuts.

Zones
5
Sensors
9
Ostadsara, Rasht
Building electrical 2026

Earthing system and earth resistance test for a clinic, Falakeh Gaz, Rasht

A new multi-electrode earthing system for a medical practice, earth resistance measured and a written report handed over.

Electrodes
4 copper-bonded rods
Measured resistance
1.6 Ω
Falakeh Gaz, Rasht
Consultation and inspection 2025

Pre-purchase electrical inspection of an older flat, Ziabari, Rasht

Wiring, board and earth of an older flat inspected and tested before purchase, with a written report of the work needed.

Circuits tested
9
Visit length
3 hours
Ziabari, Rasht
Building electrical 2025

Paddy field pump supply and protection, near Soumeh Sara

A buried feed to the field edge sized for voltage drop, a sealed board beside the pump and full protection for a three phase motor.

Motor
Three phase, 5.5 kW
Cable run
140 m
Outskirts of Soumeh Sara, Gilan
Video and audio intercom 2025

Video intercom for a four storey building, Soumeh Sara

A digital two-wire video intercom for eight flats, on a riser separate from the power, with a rain resistant door station.

Flats
8
System
Video, digital two-wire
Soumeh Sara, Gilan
Building electrical 2024

Garden house rewire and workshop feed, Gurab Zarmikh

A new board and redivided circuits, surge protection at the incomer, and a buried armoured feed to a garden workshop with its own sub-board.

Circuits
9 circuits and a sub-board
Run to workshop
65 m
Gurab Zarmikh, Gilan
CCTV 2025

CCTV on a 4G router for a garden and livestock unit, near Gurab Zarmikh

Five IP cameras with night vision, local recording on a UPS, and remote access over a mobile data connection.

Cameras
5, IP
Connectivity
4G router, external antenna
Near Gurab Zarmikh, Gilan
HV and LV switchboards 2024

Rice mill control board with soft starters, near Fuman

A new board with soft starters on the large motors, start sequencing and interlocks, phase monitoring and a stepped capacitor bank.

Motors
7 three phase
Starting
2 soft starters with bypass
Near Fuman, Gilan
Smart home 2025

Smart garden villa, on the Fuman to Masuleh road

Heating, garden lighting and irrigation pump control on relays in the board and a local controller, with power failure and low temperature alerts.

System type
Wired, relays in the board
Controlled circuits
16
Fuman to Masuleh road, Gilan
Building electrical 2023

Rewire of an older timber ceiling house, Fuman

Old surface wiring on timber replaced in flame retardant conduit, heating circuits separated and RCD protection added.

Points
42
Method
Surface, flame retardant conduit
Fuman, Gilan
Alarm and security 2025

Alarm, cameras and remote monitoring for a seaside villa, Bandar Anzali

An alarm on its own SIM, four robust outdoor cameras, leak sensors and power failure alerts for a villa empty most of the year.

Cameras
4, outdoor
Alarm zones
8 zones
Bandar Anzali, Gilan
Building electrical 2024

Corrosion resistant grounds lighting for a seaside villa, west of Anzali

Rusted fittings and boxes replaced with IP66 equipment on stainless fixings, new cabling, and control by photocell and timer.

Fittings
18
Rating
IP66
Coast road west of Anzali, Gilan
HV and LV switchboards 2025

Shop distribution board near the port, Bandar Anzali

An open, oxidised board replaced with a sealed one, circuits split, surge protection added and phases balanced for a shop with a heavy cooling load.

Outgoing ways
10
Enclosure
Closed, IP55
Port area, Bandar Anzali

Contact

Describe the job and I will take it from there

One short call is usually enough to establish what the work is, how long it takes and roughly what it costs.

Call for an accurate estimate. If I am on a job and miss the call, I ring back as soon as I am off the ladder.