Circuits
8
Supply
Single-phase, 32 A
Duration
2 days
Earthing
Two copper rods
Location
Rasht Bazaar
Year
2023

The brief

A shop on a bazaar row with two display fridges, an air conditioner and window lighting, all fed from one breaker and several extension leads. The main breaker tripped several times on hot days and the incoming cable at the board was discoloured and hot. The insurer had also asked about the shop’s electrics for renewal.

How it was done

  1. 01 Real load current measured at peak and the supply rating checked
  2. 02 Damaged incoming cable replaced and the meter connections re-made
  3. 03 New board built with a separate circuit for each fridge, the air conditioner, lighting and sockets
  4. 04 Two copper earth rods driven in the back alley with neighbours’ agreement, with an inspection box
  5. 05 Permanent extension leads removed and fixed sockets installed behind the fridges
  6. 06 Written report with earth and insulation test results handed over for the insurance file

The outcome

The main breaker no longer trips on hot days and the incoming cable runs at normal temperature. The test report went to the owner for the insurance renewal.

Contact

Describe the job and I will take it from there

One short call is usually enough to establish what the work is, how long it takes and roughly what it costs.

Call for an accurate estimate. If I am on a job and miss the call, I ring back as soon as I am off the ladder.